Professional Experience, continued
|
|
|
|
Pactiv, Red Bluff, California
¨
Fabrication and installation of new
tanks – two 25,000 gallon #2 egg carton pulper
water heater tanks at the facility
|
|
|
|
Barrick Gold
Strike,
Elko, Nevada – EMS
¨
Kiln tube replacement at the
Barrick Gold Mine Mill Carbon Strip and
Regeneration Facility.
The Kiln dimensions:
Length 60ft., width 6 ft., thickness
3/8”m type 345 stainless steel and net weight
28,500 lbs.
|
|
|
|
|
Sanwa Bank Data Center,
Los Angles, California
¨
Chill water piping retrofit - HVAC
Project
|
|
|
|
|
City of Fresno, Water Department,
Fresno, California
¨
Water tank and piping retrofit
|
|
|
|
|
Department of Interior, Bureau of Lands Management,
Elko County, Nevada
South Cross Pipeline,
Elko County, Nevada
¨
Five miles of water pipeline (on
grade) including all appurtenances (valves,
etc.) installation of 14 water troughs and
piping.
Fabrication of a 42,500-gallon potable
water tanks (sand blasting and painting).
All work done to government
specifications.
|
|
|
|
|
Hanson Dam Project, Los Angles Corps. Of Engineers
Southwest Engineering,
Santa Monica, California
¨
Fabrication of two 25,000-gallon
stainless steel ozone tanks for the Hanson Dam
Project
|
|
|
|
|
Gallo Winery, Fresno, California
¨
Fabrication and installation of
large structural steel platforms, including all
related piping installation to city code and per
specifications
|
|
|
|
|
Office Max, Selma, California
¨
Complete fire sprinkler system
installation
|
|
|
|
|
Boy Scouts of America,
Shaver Lake, Camp Chawanakee, California
¨
80,000-gallon water tank
installation
|
|
|
|
|
Dey Laboratories, Napa,
California
¨
Tank and platform installation
|
|
|
|
|
Warner Brothers Studios, Mare Island Naval Base,
Vallejo, California
¨
4 – 250,000-gallon water tanks,
disassembly and shipping
|
|
|
|
|
Catalytica Combustion Corporation,
Silicon Valley Generating Station, Santa Clara,
California
¨
Cogeneration test facility
installation, heavy industrial construction,
gas turbine installation
|
|