San Diego Police
Department Headquarters, San Diego,
CA
Energy retro fit project.
Ten (10) story building
installation of cooling towers, heat exchangers, chillers,
pumps, cogen engines, control valves, all related piping
(stainless and carbon 10, 8, 6, 4, 3, 2, and 1 inch)
|
|
|
Department of Interior,
Bureau of Land Management, (Northern) Elko,
NV
South cross pipeline tanks and
trough project.
|
|
|
Gas Turbine and Boiler.
Cogeneration (Gen-set) retro fit
Project
All related piping, pumps,
exchangers and boiler upgrades
|
|
|
Five Hundred (500) mega
watt Power Plant
Project,
Chihuahua,
Mexico
Consultant for Bulke Durr (Germany)
for air cooled condensers installation
|
|
|
PACTEV Corporation, Red
Bluff, CA
Paper pulp water tanks – demo old,
fabrication and installation of new tanks
|
|
|
VANLAW Food Projects,
Fullerton,
CA
Boilers, tanks, and stainless steel
piping installation project
|
|
|
San Diego
County Administration Building,
San Diego, CA
Energy retro fit project of cooling towers.
Demo and installation.
All related piping and control valves.
Boilers removed and replaced (all piping)
|
|
|
Ojai Valley Inn and
Spa,
Ojai,
CA
Cogeneration Energy Project – Cooling
towers, chiller, heat exchanger and all related stainless steel
piping
|
|
|
|
Davis
Retirement Community,
Davis,
CA
Cogeneration Project.
Heat exchanger and stainless steel
exhaust piping
|
|
|
Railey’s Cogeneration
Installation Project, Fairfield,
CA
Structural steel platform and
cooling tower installation
|
|
|
Sahara Casino,
Las Vegas,
NV
Old cooling towers removed and new
cooling towers installed including all related large diameter
piping
|
|
|
Georgia Pacific,
Jackson,
CA
High pressure hydraulic piping
retro fit
|
|
|
U.S. Steel,
Oakland,
CA
Heavy duty forklift structural
frame rebuild project
|
|
|
E.J. Gallo Winery
(SJVC),
Fresno,
CA
Structural steel platforms
fabrication and installation
|
|
|
Camp Chawanakee Bay
Scout Camp,
Shaver Lake,
CA
80,000 gallon potable water tank
installation project
|
|
|
Garment District,
Los Angeles,
CA
Tank demo and removal
|
|
|
|
Barrick Gold, Carlin,
NV
Carbon regeneration kiln removal
and replacement
|
|
|
Met West Apple Juice
Plant,
Del Rey,
CA
Sanitary stainless steel piping project
|
|
|
Biosciences/Pharmingen,
Torrey Pines, CA
Energy retro fit project.
Piping and heat exchangers project
|
|
|
Point Loma Waste Water
Reclamation Plant,
San Diego,
CA
Removal and replacement of stand by
generator muffler and associated stainless piping and platform
support frame
|
|
|
Desert Palms Country
Club, Desert Palms, CA
Replacement of cogeneration exhaust
piping
|
|
|
Camp Roberts Army Base,
CA
Cooling tower piping installation
and welding. Satellite communications project
|
|
|
Vandenberg Air Force Base, Space Shuttle
Launch Site
|
|
|
Mesquite,
NV:
Black construction.
Fabricate and repair water tank and carrier
|
|
|
Geothermal Generation
Facility,
China Lake Weapons Center,
CA
Sulfur scrubber and stainless steel
piping project
|
|
|
Redondo Beach Steam
Generation Plant,
Redondo Beach,
CA
Large diameter oil storage tank
demo project
Anna Verde Electrical Substations, Palmdale,
CA:
For Southern California Edison.
Fabrication, welding, and
installation of aluminum electrical bus piping
Mesquite,
NV
Water storage tank
|
|
|
Twin Rivers
Technologies,
Quincy,
MA
Fabrication and installation of
70,000 gallon stainless steel, glycerin storage tanks
|
|
|
|
Huntington Beach Edison
Plant,
Huntington Beach,
CA
Peaker Plant gas-turbine exhaust silencer
demo project
Mesquite,
NV
Disassembly and removal of water
storage tanks
Box Corrugator Plant, Temple Island Corporation,
Tracy,
CA
Concrete forms and gutter framing.
Large beams for roof support
system.
Fabrication and installation of
roof support system
E.J. Gallo Winery (SJVC),
Fresno,
CA
Installation of large diameter
ventilators, vent louvers and fans in product storage buildings
Twin Rivers Technologies,
Quicy,
MA
Stainless steel tank lay-out and
fabrication, and logistics
|
|
|
Loading Ramp and Design
San Diego Police Headquarters, San Diego,
CA
Stainless steel.
H.V.A.C. piping on various floors
E.J. Gallo Winery (SJVC), Fresno,
CA
Stainless steel.
Sparger piping, supports, tank pipe
outlets, and filter fabrication and installation
Ethanol
Distilling Plant, Goshen, CA
Truck loading station – piping, filters,
and meters; plate type heat exchanger rebuild – end plates and
outlets; tank (vessel) retro fit work; stainless steel pressure
vessel retro fit – new outlets installed (various sizes);
stainless steel tank skirt retro fit and installation; stainless
steel tanks – bottom transition outlets retro fit; and
structural steel retro fit
|
|
|
Ethanol Plant,
Goshen,
CA
Stainless steel tank retro fit.
Outlet transitions.
Stainless steel tanks relocation
E.J. Gallo Winery, Madera,
CA
Oak charcoal hanger racks (inside
tanks)
Ethanol Plant, Goshen,
CA
Sandblasting, painting, stainless
steel pipe outlets installation for stainless steel mixing
vessels
San Diego Police Headquarters, San Diego,
CA
Hess cogen engines piping and exchangers
|
|
|
Del Monte Foods,
Modesto,
CA
1500 H.P. Boiler, piping, pumps,
supports, controls installation project
San Jose Water Department, San Jose,
CA
Demolition and removal of old water
storage tank
E.J. Gallo Winery (SJVC),
Fresno,
CA
Boiler, piping, and exhaust stack
installation project.
Water well sand filter and
stainless piping
|
|
|
Redondo Beach Steam
Generation Plant,
Redondo Beach,
CA
Large oil storage tank demolition
and steel removal project
|
|
|
|
|
|
|
|