logo

 

 

Professional Experience, continued

 

 

 

 

San Diego Police Department Headquarters, San Diego, California

¨       Retrofit and new installation of carbon steel and all 10, 8, 6, 4, 3, and 2 inch stainless steel HVAC piping, cooling tower installation, coordination of heavy lifts and machinery installation with Police Department and General Contractor

 

 

 

Sahara Casino, Las Vegas, Nevada

¨       Installed two 800 ton (EVAPCO) Cooling Towers, including all necessary piping valves, structural and crane work

 

 

 

 

Davis retirement Community, Davis, California

¨       Generation installation job.  Installed 4” and 6” stainless exhaust piping system for Hess Micro Gen Units

¨       Sub-contract to NEC, Marietta, California

 

 

 

 

Ojai Valley Inn and Spa Country Club, Cogeneration Project, Ojai, California

¨       Installation of all piping (stainless steel and carbon) for the new Co-Generation plant, cooling tower, and machine room

¨       Sub-contract to NEC, Marietta, California

 

 

 

 

Point Loma, San Diego, California

¨       Removal and replacement of standby generator muffler and piping system (stainless steel) per San Diego Engineering Specks

¨       Sub-contract to NEC, Marietta, California

 

 

 

 

Royalty Carpet, Irvine, California

¨       Demolition of heavy machinery (carpet vulcanizing machine)

 

 

 

 

BD Bio Sciences/Pharmingen, Torrey Pines, San Diego, California

¨       Energy retrofit, cogeneration piping installation

¨       Sub-contract to NEC, Marietta, California

 

 

 

 

Van Law Food Products, Fullerton, California

¨       Broilers, tanks and stainless steel piping installations – 500 and 200 gallon portable water holding tank, glass lined and to ASME code, including safety valve, installation of piping and fittings to specifications

 

 

 

 

City of San Diego, San Diego, California

¨       County Administration Building, Concourse and Civic Theater energy efficiency retrofit project.  Demolition of two (2) old wooden cooling towers.  Replacement of two (2) 800 ton stainless cooling towers, all piping, control valves, filter system, structural changes and supports, access ladders, and safety platforms and railing.  Removal of two (2) old boilers and D.A. tank and appurtenances.  Replacement of one (1) new 50 H.P. boiler, one (1) 100 H.P. boiler, one (1) D.A. tank, pumps, control valves, all piping to specifications to suit.


PROFESSIONAL EXPERIENCE CONTINUED...

   
Copyright 2008   All rights reserved. Voege Welding & Construction   Website development by www.datadesignlv.com
Photo gallery adapted by www.arounduphoto.com