Professional Experience, continued
|
|
|
|
|
San Diego Police Department Headquarters, San Diego, California
¨
Retrofit and new installation of
carbon steel and all 10, 8, 6, 4, 3, and 2 inch
stainless steel HVAC piping, cooling tower
installation, coordination of heavy lifts and
machinery installation with Police Department
and General Contractor
|
|
|
|
Sahara Casino, Las Vegas, Nevada
¨
Installed two 800 ton (EVAPCO)
Cooling Towers, including all necessary piping
valves, structural and crane work
|
|
|
|
|
Davis retirement Community,
Davis, California
¨
Generation installation job.
Installed 4” and 6” stainless exhaust
piping system for Hess Micro Gen Units
¨
Sub-contract to NEC, Marietta,
California
|
|
|
|
|
Ojai Valley Inn and Spa Country Club,
Cogeneration Project, Ojai, California
¨
Installation of all piping
(stainless steel and carbon) for the new
Co-Generation plant, cooling tower, and machine
room
¨
Sub-contract to NEC, Marietta,
California
|
|
|
|
|
Point Loma, San Diego, California
¨
Removal and replacement of standby
generator muffler and piping system (stainless
steel) per San Diego Engineering Specks
¨
Sub-contract to NEC, Marietta,
California
|
|
|
|
|
Royalty Carpet, Irvine,
California
¨
Demolition of heavy machinery
(carpet vulcanizing machine)
|
|
|
|
|
BD Bio Sciences/Pharmingen,
Torrey Pines, San Diego, California
¨
Energy retrofit, cogeneration
piping installation
¨
Sub-contract to NEC, Marietta,
California
|
|
|
|
|
Van Law Food Products,
Fullerton, California
¨
Broilers, tanks and stainless steel
piping installations – 500 and 200 gallon
portable water holding tank, glass lined and to
ASME code, including safety valve, installation
of piping and fittings to specifications
|
|
|
|
|
City of San Diego, San Diego,
California
¨
County Administration Building,
Concourse and Civic Theater energy efficiency
retrofit project.
Demolition of two (2) old wooden cooling
towers.
Replacement of two (2) 800 ton stainless
cooling towers, all piping, control valves,
filter system, structural changes and supports,
access ladders, and safety platforms and
railing.
Removal of two (2) old boilers and D.A.
tank and appurtenances.
Replacement of one (1) new 50 H.P.
boiler, one (1) 100 H.P. boiler, one (1) D.A.
tank, pumps, control valves, all piping to
specifications to suit.
|
|